Employer
VERBUND Hydro Power GmbH
Europaplatz 2, AT-1150 Vienna
Designer
VERBUND Hydro Power GmbH in cooperation with the designers Joint Venture PSW Limberg III
GEOCONSULT ZT GmbH
TRACTEBEL Engineering GmbH
Urstein Süd 13, AT-5412 Puch bei Hallein
Construction Period
04. 2021 - 11.2025
Contract Sum
EUR 145 Mio (CHF 156 Mio.)
Execution of the Work
ARGE PSW Limberg III
Consortium Partners
G. Hinteregger & Söhne Bau GmbH, AT-5020 Salzburg
Marti Tunnel AG, CH-3302 Moosseedorf
PORR Bau GmbH, AT-1100 Wien
Marti GmbH, AT 8055 Graz
Lead Company and Technical Lead
Marti Tunnel AG, CH-3302 Moosseedorf
Commercial Lead
G. Hinteregger & Söhne Bau GmbH, AT-5020 Salzburg
More…
Less…
Scope of the Works
The Limberg III pump storage power plant will be built almost identical to the Limberg II pump storage power plant and will connect the two existing storage lakes Mooserboden and Wasserfallboden in the municipality of Kaprun i. The new electro-mechanical installations power plant facilities will be placed in an new underground cavern, gallery and structure system.
Activities
Driven waterway
- Inlet gallery L = 768m; A = 43 m²
- Slide chamber Drossen V = 6'000 m³
- TBM headrace tunnel L = 3'206m; A = 42 m²
- Inclined or pressure shaft TBM
L = 771m; A = 26 m²
- Underwater gallery L = 613m; A = 60 m²
Power and transformer cavern
- Power cavern V = 53'000 m³
Transformer cavern V = 15'500 m³
Surge chamber
- Upper chamber L = 286m, A =47 / 29 m²
- Lower chamber (widening) L = 179m, A =90 m²
Limberg access tunnel
- Safety gallery L = 203m, A = 29 m²
- Ventilation and drainage gallery
L = 460m; A = 35 m²
- Drossen slide chamber access gallery
- Access gallery L = 338m; A = 35 m²
- Evacuation gallery L = 111m, A = 35 m²
- Drainage gallery L = 126m, A = 11 m²
Concrete box Drossen
Storage areas (landfill for excavated material)
Hinterwald V = 300'000 m³
Site facilities
- Hinterwald A = 14'200m², 1'850 müA
- Mooserboden A = 12'900m², 2.025 müA
- Kehre 6 A = 6'650m², 880 müA
Geology
The Limberg III project area is dominated by the several kilometer thick 'Bündner Schieferserie' in the Glockner facies of the Tauern schist envelope. It consists largely of an alternating bedding of calcareous mica schists with prasinites prasinites and dark mica schists. At the Höhenburg, quartzites and dolomites are also intercalated.