Employer
Swiss Federal Railways SBB,
Avenue de la Gare 43, CH-1003 Lausanne
Designer
Joint Venture LNC
ATB + CVH + Lombardi
p.a. Monod Piguet + Associés SA
Avenue de Cour 32, CH-1007 Lausanne
Time of Completion
06.2020 – 04.2022
Execution of the Work
Consortium Marti NE-CF
Consortium Partners
Marti Tunnel AG, CH-3302 Moosseedorf
Marti Travaux Spéciaux Neuchâtel SA, CH-2087 Cornaux
Lead Company – Technical and Commercial Lead
Marti Tunnel AG, CH-3302 Moosseedorf
More…
Less…
Scope of the Works
CFF Line 224 / Lot 3 / Project No. 1148146
Neuchâtel – La Chaux-de-Fonds (CH)
Minimal renovation of the tunnels des Loges and du Mont-Sagne. Renewal of the tunnel Combe-Convers.
Construction of the Grandes-Crosettes coupling station.
Activities
Main quantities: LOG MTS CCO Total
Excav. MUV: 23’000m³ 2’510m³ 10’200m³ 35’710m³
Blade cuts: 2’500m² 4’000m²
Shocrete: 16’700m³ 720m³ 2’880m³ 20’300m³
Lattice girder: 50to 8to 55to 113to
Waterproofing: 7’500m² 790m² 1’720m² 10’010m²
Tunnel des Loges LOG, 3'259m:
- Collecting and sealing water inlets from the mountain.
- Demolishing of the existing masonry support; Section
enlargement; Construction of a new shotcrete vault.
- Diamond blade cutting of existing rock for reprofiling
- Excavation and support works for 6 new logistics niches.
- Replacement of the cable channel and floor drain.
- Refurbishments works at the portals.
Tunnel du Mont-Sagne MTS, 1'352m:
- Collecting and sealing water inlets from the mountain.
- Demolishing of the existing masonry support; Section
enlargement; Construction of a new shotcrete vault.
- Diamond blade cutting of existion rock for reprofiling
- Replacement of the cable channel and floor drain.
- Refurbishments works at the portals.
Tunnel de Combe-Convers CCO, 254m:
- Collecting and sealing water inlets from the mountain.
- Excavation and support works for 5 new escape
niches.
- Demolishing of the existing masonry support; Section
enlargement; Construction of a new shotcrete vault.
- Replacement of the cable channel and floor drain.
- Refurbishments works at the portals.
Geology
The line crosses the Jura rocky chain. It is the result of a folding of the Mesozoic marl-limestone series. The limestone sections are fractured and karstic and are potential aquifers.