Employer
Hordaland fylkeskommune, Bybanen Utbygging,
NO-29303 Bergen
Designer
SWECO, SW-12030 Stockholm
Time of Completion
01.2019 – 12.2022
Contract Sum
CHF 98 Mio. (NOK 816 Mio.)
Execution of the Work
Marti Tunnel Ltd., CH-3302 Moosseedorf
Lead Company – Technical and Commercial Lead
Marti Tunnel Ltd., CH-3302 Moosseedorf
More…
Less…
Scope of the Works
The Løvstakktunnel project, construction lot D15, as part of the extension of Bergen's tramway network, comprises the excavation of a 3 km long tramway tunnel with a parallel pedestrian and cycle tunnel (also serves as an evacuation tunnel) and 6 cross passages, 2 x 150 m long caverns as a railway depot, a rock cut for access buildings to the depot as well as extensive outdoor concrete work such as a cut & cover portal structure and numerous retaining wall structures.
Boundary data:
- 3 km double-track tram tunnel with 10 m width, 6 m height over upper edge of the rail, total approx. 233'300 m³.
- Rock outburst
- 3 km evacuation/pedestrian/cycle tunnel with
- T7, 5 SVV standard profile, total approx. 169'700 m³ rock outburst
- 6 cross passages with SVV standard profile T4 and approx. 18 m length, total approx. 8'500 m³ rock excavation
- 2 niches for technical buildings, total
approx. 1'500 m³ rock excavation
- Pumping station with basin, total approx. 5'000 m³
rock outburst
- Rock cut for access building with an area of 1’000 m² and a max. height of 16 m
- 2 depot halls with lengths 120-130 m, width of
17 m and height of 8 m, cross section 140 m²
- Access tunnel from the tram tunnel to the depot with a length of approx. 450 m, two branches at each end, cross-section varies between 55 and 180 m²
- Cut & Cover concrete portal with 120 m length
- Several retaining walls up to 7.30 m high
- Reconstruction of the road facilities incl.
- Roundabout on the portal
- Restoration of the landscape facilities
Activities
- Conventional blast tunneling
- advance injections with concrete, post injections
with PU- Rock protection using shotcrete, systematic
anchoring, spikes, reinforced shotcrete arches and pipe umbrella- surface blasting
- concrete work
- earthworks and exterior works
- road construction
- Project management completely using BIM (Building Information Modeling)
- Installation of a membrane (sealing against water) according to Norwegian standard