Client
AlpTransit Gotthard AG, CH-6003 Luzern
Construction Period
01.2015 – 12.2020
Contract Sum
CHF 140.8 Mio.
Joint Venture Partners
Marti Tunnel AG, CH-3302 Moosseedorf
Mancini & Marti SA, CH-6500 Bellinzona
Pizzarotti SA, CH-6500 Bellinzona
Impresa Pizzarotti & C. S.p.A., I-43121 Parma
G.C.F., Generale Costruzioni Ferroviarie S.p.A.,
I-74023 Grottaglie
GEFER S.p.A., I-00144 Roma
Joint Venture Company
ARGE Mons Ceneris
Lead Company
Mancini & Marti SA, CH-6500 Bellinzona
Technical Lead
Marti Tunnel AG, CH-3302 Moosseedorf
Pizzarotti SA, CH-6500 Bellinzona
G.C.F., Generale Costruzioni Ferroviarie S.p.A., I-74023 Grottaglie
Commercial Lead
Pizzarotti SA, CH-6500 Bellinzona
More…
Less…
Project description
The "Track and Logistics Lot" is for the installation of the ballastless track in both single-track tunnel tubes each with a length of 15.4 km as well as construction of the conventional ballasted track with the necessary points and drives outside the portals to link to the existing railway network.
Work description
Planning, development, manufacture, delivery and construction of tracks (ballasted track and slab track) as well as switches including NBS North open-area line, integration, commissioning and maintenance (up to approval of the work).
Planning, delivery, construction, operation and dismantling of the Camorino installation site and all transport and handling logistics for the assembly of the railway technology in the CBT and the NBS North open-area line.
Technical data
- 30'000m slab track with an extension speed of 250km/h
- 5'000m ballasted track with a speed of up
to 250km/h
- 3 points in slab track and ballasted track with
an upgrading speed of up to 160km/h
- 25 provisional points and 4'000m provisional
ballast track