Employer
Tunnel Küchen, A44 VKE 32, DE-34117 Kassel
Designer
Ingenieurgemeinschaft BUNG - müller + hereth, DE
Construction Period
11.2012 – 04.2017
Contract Sum
CHF 89 Mio. (€ 74 Mio.)
Execution of the Work
ARGE Tunnel Küchen
Joint Venture Partners
Marti Tunnel AG, CH-3302 Moosseedorf
Marti GmbH Deutschland, DE-70567 Stuttgart
Johann Bunte Bauunternehmung GmbH & Co.KG,
DE-26871 Papenburg
Lead Company and Technical Lead
Marti Tunnel AG, CH-3302 Moosseedorf
Commercial Lead
Johann Bunte Bauunternehmung GmbH & Co.KG,
DE-26871 Papenburg
More…
Less…
Project description
New highway BAB 44 Kassel - Herleshausen, VKE32 Tunnel Küchen.
The contract comprises a 4.3 km long stretch consisting of the twin-tube Küchen tunnel (south tube: 1'333 m / north tube: 1'372 m), earth works and road construction Küchen. Due to the tunnel length, 5 cross connections and 2 emergency breakdown bays are planned.
Work description
The tunnel is to be built up as a double lined vault construction: with a shotcrete- and a cast in place concrete inner lining. The site installations are located near a residential area. The cross section is of 100 m² and 135 m² in the emergency niches. The excavation is performed with the D&B method and crosses under the Küchen location with a minimum overburden of 5.5 m. The construction works started in December 2012, including amongst other, the excavation of the pre-cut of the Küchen tunnel.
- Open construction pit east 2 x 20 m
- Shotcreted portal east 42 m and 72 m
- Rock tunnel 1 x 1‘259 m
1 x 1‘198 m
- Shotcreted portal west 32 m and 23 m
- Open construction pit west 2 x 20 m
- Excavation volumes 260‘000 m³
Concrete-/shotcrete volume ca. 140‘000 m³
- Reinforcement steel ca. 14‘600 t
- Construction method
sprayed concrete lining excavation method (top heading, bench and invert excavation)
- Minimum overburden 5.5 m
- Maximum overburden 47 m
Geology
The Tunnel Küchen lies along its entire length in sedimentary red sandstone formations.
The tunnel has an overburden in a range of 5.5 to
47 meters. Due to the proximity of the groundwater level, the entire structure is protected by a waterproofing membrane.