Client
ASFINAG
(Autobahnen- und Schnellstrassen-
Finanzierungs-Aktiengesellschaft, Wien), AT-1010 Wien
Designer
Planungsgemeinschaft Bernard Ing. + IBK,
AT-1020 Wien
Construction Period
01.2016 – 04.2018
Contract Sum
CHF 68 Mio. (€ 61.3 Mio.)
Joint Venture Company
ARGE S16 Perjentunnel Marti
Joint Venture Partners
Marti GmbH Österreich, AT-8045 Graz
Marti Tunnel AG, CH-3302 Moosseedorf
Lead Company and Technical Lead
Marti GmbH Österreich, AT-8045 Graz
Commercial Lead
Marti Tunnel AG, CH-3302 Moosseedorf
More…
Less…
Project description
The Perjen Tunnel project includes the construction of the second tube of the existing bypass between Zams and Landeck in Tyrol. In addition to the main tube, 10 cross connections must be built to connect to the existing tube.
In both portals important outside works must be undertaken as the (construction of road sections, the operation buildings and the water protection installations).
Work description
- Length of tunnel 2.9 km
- Main tube diameter 81 - 113 m²
- Cross connections 10 pcs
- Drill & Blast and mechanical excavation
- Excavation (compact rock) 260'000 m³
- Concrete 140'000 m³
hereof shotcrete 50'000 m³- Pipe-umbrella excavation
- IConcrete inner lining
- Earthwork, reinforcement and concrete works
- Road construction
Geology
- Main dolomite
- Quarzite phyllite
- Phyllonite micaschist